RWA

Water Resources
Boney Wetland Restoration
Collier County Watershed Master Plan
Gordon River Water Quality Park
Lely Main Canal Filter Marsh and Salinity Control Structure
Lely Manor North-South Canal
Marco Island Right-of-Way and Drainage Master Plan

Utilities
Bonita Springs Utilities Old 41 Utility Relocates Phase II
Bonita Springs Utilities, Inc. Engineer of Record
Cape Coral Utility Expansion
Coconut Square Master Lift Station
Collier Water Main Interconnect
East Bonita Beach Road Force Main Upgrade
Old 41 Shangrila Road Effluent Main & Force Main
Spring Creek Village Water & Sewer Study
Strike Lane RO Plant Raw Water Main & Transmission Main
Windsor Road CFPD Water Tank Rezoning

Facilities-Institutional
Collier Area Transit (CAT) Depot
Collier County Fleet Facility
EMS Medstar Facility at Page Field
G. Weaver Hipps Elementary School
Golden Gate Fire Station #73
Naples High School Gym Addition
Neil Armstrong Elementary School
Peace River Elementary School

Transportation
Collier Boulevard Widening
Del Prado Boulevard Widening
Golden Gate Boulevard
Golden Gate Parkway Grade Separated Overpass
Livingston Road East/West Intersection
Planning Services for Right-of-Way Acquisition
Treeline Boulevard
Vanderbilt Beach Road Extension

Community & Area Wide Plans
Bayshore-Gateway Triangle Community Redevelopment Agency Catalyst Projects
Charlotte County East County Planning Guide
Collier County LDR Amendments & Rural Lands Stewardship
Collier County Rural and Agricultural Lands Assessment
Hendry County EAR
Hendry County Rural & Agricultural Lands Study
Highlands County Rural Area Plan
Immokalee Area Master Plan

Residential
Aqua / Cocohatchee River Park
Forest Glen Golf Course Remodel
Forest Glen Master Planned Community
Hideout Golf Club
Madeira Condo and Golf Club
Mariner's Landing Senior Housing
Mediterra
Parklands Planned Unit Development
Pelican Preserve DRI
Regatta
Sabal Bay Master Planned Community
Summer Lakes Apartments
Summit Place
Vasari Country Club
Village Walk of Bonita Springs
Waterways of Naples

Commercial
Audubon Center
Caribbean Gardens Zoo
Coastland Center Mall
Hawthorne Suites
Hotel Escalante
Marco Island Marriott Resort
Sancerre
Shoppes at Pebblebrooke
Wiggins Crossing Shopping Center

What We Do
Portfolio
Photo
Golden Gate Parkway Grade Separated Overpass

Project Location:  Naples, FL




After three years in planning and design, the construction of Collier County's first overpass project started in the Fall of 2004. County officials hope to minimize traffic congestion by building a grade-separated overpass at the intersection of Golden Gate Parkway and Airport-Pulling Road. This “gateway” to the City of Naples will include a decorative bridge structure, street lighting, and substantial landscape improvements.

The project called for the three-mile reconstruction conversion of a rural four-lane to an urban six-lane roadway and construction of a grade-separated overpass. RWA provided consulting services in Surveying, Engineering, Planning, and Visualization. Survey work included a project design survey, sketch and descriptions for right-of-way takings and easements, and right-of-way map preparation. Along with services for the design and South Florida Water Management (SFWMD) permitting of a drainage and stormwater management plan, the RWA team also conducted geotechnical testing of the site. Transportation consulting services consisted of access management, traffic data analysis, preparation of roadway plans and specifications, relocation and coordination of utilities, lighting plans, signing and marking plans, signalization plans, maintenance of traffic plans, and design coordination and integration with the proposed I-75 interchange at Golden Gate Parkway.

The project required tremendous interagency and inter-design team coordination and cooperation to allow for incorporation of the recent construction of the Livingston Road extension and the proposed Florida Department of Transportation (FDOT) I-75 Interchange at Golden Gate Parkway.  The construction cost of the project was approximately $42 million and the project was completed in 2007. 

Photo

To view larger image, mouse over the thumbnail image to the right. To view largest image, click on the thumbnail. Once enlarged you can view the next image in the series by moving your cursor over top right corner of the image or by typing "n" on your keyboard. To go to previous, mouse over left corner or type "p".

 

Powered by Internet Office, Inc.
Copyright © 2008 consult-rwa.com
Civil Engineering | Land Planning | Surveying and Mapping | Landscape Architecture
Land Development | Permitting | Infrastructure Design | Master Planned Communities
Water Resources | Transportation | Commercial | Industrial
Facilities | Utilities | Construction | Public Works | 3D Laser Scanner
Southwest Florida | Central Florida