RWA

Water Resources
Boney Wetland Restoration
Collier County Watershed Master Plan
Gordon River Water Quality Park
Lely Main Canal Filter Marsh and Salinity Control Structure
Lely Manor North-South Canal
Marco Island Right-of-Way and Drainage Master Plan

Utilities
Bonita Springs Utilities Old 41 Utility Relocates Phase II
Bonita Springs Utilities, Inc. Engineer of Record
Cape Coral Utility Expansion
Coconut Square Master Lift Station
Collier Water Main Interconnect
East Bonita Beach Road Force Main Upgrade
Old 41 Shangrila Road Effluent Main & Force Main
Spring Creek Village Water & Sewer Study
Strike Lane RO Plant Raw Water Main & Transmission Main
Windsor Road CFPD Water Tank Rezoning

Facilities-Institutional
Collier Area Transit (CAT) Depot
Collier County Fleet Facility
EMS Medstar Facility at Page Field
G. Weaver Hipps Elementary School
Golden Gate Fire Station #73
Naples High School Gym Addition
Neil Armstrong Elementary School
Peace River Elementary School

Transportation
Collier Boulevard Widening
Del Prado Boulevard Widening
Golden Gate Boulevard
Golden Gate Parkway Grade Separated Overpass
Livingston Road East/West Intersection
Planning Services for Right-of-Way Acquisition
Treeline Boulevard
Vanderbilt Beach Road Extension

Community & Area Wide Plans
Bayshore-Gateway Triangle Community Redevelopment Agency Catalyst Projects
Charlotte County East County Planning Guide
Collier County LDR Amendments & Rural Lands Stewardship
Collier County Rural and Agricultural Lands Assessment
Hendry County EAR
Hendry County Rural & Agricultural Lands Study
Highlands County Rural Area Plan
Immokalee Area Master Plan

Residential
Aqua / Cocohatchee River Park
Forest Glen Golf Course Remodel
Forest Glen Master Planned Community
Hideout Golf Club
Madeira Condo and Golf Club
Mariner's Landing Senior Housing
Mediterra
Parklands Planned Unit Development
Pelican Preserve DRI
Regatta
Sabal Bay Master Planned Community
Summer Lakes Apartments
Summit Place
Vasari Country Club
Village Walk of Bonita Springs
Waterways of Naples

Commercial
Audubon Center
Caribbean Gardens Zoo
Coastland Center Mall
Hawthorne Suites
Hotel Escalante
Marco Island Marriott Resort
Sancerre
Shoppes at Pebblebrooke
Wiggins Crossing Shopping Center

What We Do
Portfolio
Photo
EMS Medstar Facility at Page Field

 

RWA has nearly completed all work on a new 15,000 square foot facility for Lee County EMS’ Medstar Service. This project is located on approximately 1.5 acres at Page Field, a General Aviation airport in Lee County, and consists of two Advanced Life Support ground units, a two-bay hangar for air ambulances, a mobile emergency command center, living quarters, and administrative spaces. The site also includes an access road, parking, and a taxiway apron. 

The site selection component of this project was an integral part of the site planning exercise conducted by RWA.  Several sites were reviewed for their utility access, stormwater management complications, environmental concerns, site lines from the control tower, off site access for the ALS units, FAA antenna and communication equipment, and finally incorporating the desired building height and minimum requirements for supporting infrastructure to limit the lease area.  Close coordination with the architect was needed to complete the site selection within the parameters desired by the client.

Project work included site improvements, sewer, water, and landscaping design to meet the City of Fort Myers and Stormwater Management District Codes.  Water main relocation was required to allow for installation of a new taxiway apron to be installed.  RWA also provided coordination with the architect, environmental consultant, landscape architect, electrical / site lighting engineer, and the geotechnical engineering consultants.  Environmental concerns related to the endangered burrowing owl necessitated close coordination with County environmental staff to ensure proper mitigation and resolution of the permitting for the entire site. 

Other services provided by RWA include pre-design topographic survey data and a boundary survey of the final site boundary with supporting easement descriptions for the lease area.

Construction began in the Summer of 2008 and occupancy is slated for the Fall of 2009.  Total construction cost for this project is $4 million. 


Photo

To view larger image, mouse over the thumbnail image to the right. To view largest image, click on the thumbnail. Once enlarged you can view the next image in the series by moving your cursor over top right corner of the image or by typing "n" on your keyboard. To go to previous, mouse over left corner or type "p".

 

Powered by Internet Office, Inc.
Copyright © 2008 consult-rwa.com
Civil Engineering | Land Planning | Surveying and Mapping | Landscape Architecture
Land Development | Permitting | Infrastructure Design | Master Planned Communities
Water Resources | Transportation | Commercial | Industrial
Facilities | Utilities | Construction | Public Works | 3D Laser Scanner
Southwest Florida | Central Florida