RWA

Water Resources
Boney Wetland Restoration
Collier County Watershed Master Plan
Gordon River Water Quality Park
Lely Main Canal Filter Marsh and Salinity Control Structure
Lely Manor North-South Canal
Marco Island Right-of-Way and Drainage Master Plan

Utilities
Bonita Springs Utilities Old 41 Utility Relocates Phase II
Bonita Springs Utilities, Inc. Engineer of Record
Cape Coral Utility Expansion
Coconut Square Master Lift Station
Collier Water Main Interconnect
East Bonita Beach Road Force Main Upgrade
Old 41 Shangrila Road Effluent Main & Force Main
Spring Creek Village Water & Sewer Study
Strike Lane RO Plant Raw Water Main & Transmission Main
Windsor Road CFPD Water Tank Rezoning

Facilities-Institutional
Collier Area Transit (CAT) Depot
Collier County Fleet Facility
EMS Medstar Facility at Page Field
G. Weaver Hipps Elementary School
Golden Gate Fire Station #73
Naples High School Gym Addition
Neil Armstrong Elementary School
Peace River Elementary School

Transportation
Collier Boulevard Widening
Del Prado Boulevard Widening
Golden Gate Boulevard
Golden Gate Parkway Grade Separated Overpass
Livingston Road East/West Intersection
Planning Services for Right-of-Way Acquisition
Treeline Boulevard
Vanderbilt Beach Road Extension

Community & Area Wide Plans
Bayshore-Gateway Triangle Community Redevelopment Agency Catalyst Projects
Charlotte County East County Planning Guide
Collier County LDR Amendments & Rural Lands Stewardship
Collier County Rural and Agricultural Lands Assessment
Hendry County EAR
Hendry County Rural & Agricultural Lands Study
Highlands County Rural Area Plan
Immokalee Area Master Plan

Residential
Aqua / Cocohatchee River Park
Forest Glen Golf Course Remodel
Forest Glen Master Planned Community
Hideout Golf Club
Madeira Condo and Golf Club
Mariner's Landing Senior Housing
Mediterra
Parklands Planned Unit Development
Pelican Preserve DRI
Regatta
Sabal Bay Master Planned Community
Summer Lakes Apartments
Summit Place
Vasari Country Club
Village Walk of Bonita Springs
Waterways of Naples

Commercial
Audubon Center
Caribbean Gardens Zoo
Coastland Center Mall
Hawthorne Suites
Hotel Escalante
Marco Island Marriott Resort
Sancerre
Shoppes at Pebblebrooke
Wiggins Crossing Shopping Center

What We Do
Portfolio
Photo
Coastland Center Mall

Project Location:  Naples, FL







For the expansion of the Coastland Center Mall, RWA was contracted for its expertise in professional land surveying and initial permitting due diligence. Some of the specialty surveying performed by RWA included a topographic survey of the site’s existing improvements.  Beginning by plotting a benchmark necessary for obtaining a building permit, RWA Surveyors then performed the necessary surveying work essential to carrying out the required engineering design process. Surveyors recorded spot elevations of all visible surface areas and floor elevations of all existing buildings. A plotting was taken of both above-ground and surface storm drainage utilities, sanitary sewer infrastructure, and gas service located within the survey area. Surveys accounted for the location of all fire hydrants, valves, and potable water appurtenances and of all flood plains and floodways.  Horizontal control was established using Trimble 5800 GPS equipment.

The retail site for a new Cheesecake Factory restaurant required that an ALTA survey be prepared for legal purposes. The scope of this work included the following services:

Construction stakeout for a construction fence and entrance, sanitary sewer and storm drainage, parking area and irrigation sleeving; building stakeout; sidewalks; and record drawings of the planned backbone infrastructure.

RWA Engineers also served on the project to provide services in general and site planning consulting. These included permitting consultation and advice, as well as reviewing the proposed site plans to allow for the modification of the entire mall property.  Input and direction as it related to water management facilities was also provided. The site plan was checked for consistency with applicable zoning and development regulations.  Preparation and support of an ERP Letter Modification to the South Florida Water Management District (SFWMD) streamlined communication with the review committee and identified the possible neeed for revisions to the designs, calculations, and plans.


Photo

To view larger image, mouse over the thumbnail image to the right. To view largest image, click on the thumbnail. Once enlarged you can view the next image in the series by moving your cursor over top right corner of the image or by typing "n" on your keyboard. To go to previous, mouse over left corner or type "p".

 

Powered by Internet Office, Inc.
Copyright © 2008 consult-rwa.com
Civil Engineering | Land Planning | Surveying and Mapping | Landscape Architecture
Land Development | Permitting | Infrastructure Design | Master Planned Communities
Water Resources | Transportation | Commercial | Industrial
Facilities | Utilities | Construction | Public Works | 3D Laser Scanner
Southwest Florida | Central Florida