RWA

Water Resources
Boney Wetland Restoration
Collier County Watershed Master Plan
Gordon River Water Quality Park
Lely Main Canal Filter Marsh and Salinity Control Structure
Lely Manor North-South Canal
Marco Island Right-of-Way and Drainage Master Plan

Utilities
Bonita Springs Utilities Old 41 Utility Relocates Phase II
Bonita Springs Utilities, Inc. Engineer of Record
Cape Coral Utility Expansion
Coconut Square Master Lift Station
Collier Water Main Interconnect
East Bonita Beach Road Force Main Upgrade
Old 41 Shangrila Road Effluent Main & Force Main
Spring Creek Village Water & Sewer Study
Strike Lane RO Plant Raw Water Main & Transmission Main
Windsor Road CFPD Water Tank Rezoning

Facilities-Institutional
Collier Area Transit (CAT) Depot
Collier County Fleet Facility
EMS Medstar Facility at Page Field
G. Weaver Hipps Elementary School
Golden Gate Fire Station #73
Naples High School Gym Addition
Neil Armstrong Elementary School
Peace River Elementary School

Transportation
Collier Boulevard Widening
Del Prado Boulevard Widening
Golden Gate Boulevard
Golden Gate Parkway Grade Separated Overpass
Livingston Road East/West Intersection
Planning Services for Right-of-Way Acquisition
Treeline Boulevard
Vanderbilt Beach Road Extension

Community & Area Wide Plans
Bayshore-Gateway Triangle Community Redevelopment Agency Catalyst Projects
Charlotte County East County Planning Guide
Collier County LDR Amendments & Rural Lands Stewardship
Collier County Rural and Agricultural Lands Assessment
Hendry County EAR
Hendry County Rural & Agricultural Lands Study
Highlands County Rural Area Plan
Immokalee Area Master Plan

Residential
Aqua / Cocohatchee River Park
Forest Glen Golf Course Remodel
Forest Glen Master Planned Community
Hideout Golf Club
Madeira Condo and Golf Club
Mariner's Landing Senior Housing
Mediterra
Parklands Planned Unit Development
Pelican Preserve DRI
Regatta
Sabal Bay Master Planned Community
Summer Lakes Apartments
Summit Place
Vasari Country Club
Village Walk of Bonita Springs
Waterways of Naples

Commercial
Audubon Center
Caribbean Gardens Zoo
Coastland Center Mall
Hawthorne Suites
Hotel Escalante
Marco Island Marriott Resort
Sancerre
Shoppes at Pebblebrooke
Wiggins Crossing Shopping Center

What We Do
Portfolio
Photo
Hotel Escalante

Project Location:  Naples, FL











The Lawrence Group Architects retained RWA to provide civil engineering and land surveying services for a redevelopment project that transformed the previously-existing Beachcomber Club motel into a 71-room Mediterranean-style garden retreat located in the heart of exclusive Old Naples, just steps from the pristine Gulf of Mexico beaches. The 2.25-acre site houses 12 hotel buildings, an improved alley, swimming pool with patio area, motor courtyard and associated grass parking spaces.

RWA identified and analyzed the regulatory permitting requirements and participated in consultations with those authorities having jurisdiction over the approval process. In winning permitting approval, RWA prepared applications to the following agencies:

City of Naples for a Site Development Plan
City of Naples for Right of Way Permit
Florida Department of Environmental Protection (FDEP) Notice of Intent to Use General Permit for Sewer Collection/Transmission System
Florida Department of Environmental Protection (FDEP) Notice of Intent to Use General Permit for Potable Water Distribution System
EPA for NPDES Notice of Intent to Use General Permit


To begin the process of locating aerial facilities below ground within the existing alley, RWA needed to coordinate with utility service providers on issues regarding the proposed improvements. RWA designed the required on-site infrastructure for the project based upon the approved client site plan. Final engineering design included potable water mains, site fire protection, sanitary sewer lines, storm drainage lines, site grading, earthwork, grass parking and asphalt paving. Services for construction plans and technical specifications followed.

The Engineering Team also provided engineer and field representation services during the construction of the on-site improvements. This included the preparation, submittal, and support of engineer-related preliminary utility acceptance checklist items as applicable and required by Collier County Development Services.

RWA Surveyors reviewed the recorded plats, current boundary survey, and existing easements of record for the project area, and prepared an exhibit based upon the conducted research showing the known elements. Design phase surveying included the following:

Coordination with the City of Naples, FP&L, telephone, and CATV to have existing improvements within alley clearly marked or flagged for the purpose of data collection; collection of data that had been marked in the field by the above named utility service providers and prepare an exhibit of existing conditions; location and collection of spot elevations of existing improvements within alley and at points of connection; collection of spot elevations on the project site used as the basis for site grading design purposes.

RWA prepared sketches and descriptions of the required easements for the purpose of utilities (FP&L, telephone, CATV), drainage and water and sewer utilities. Other services included the location of existing trees as indicated by client.

Photo

To view larger image, mouse over the thumbnail image to the right. To view largest image, click on the thumbnail. Once enlarged you can view the next image in the series by moving your cursor over top right corner of the image or by typing "n" on your keyboard. To go to previous, mouse over left corner or type "p".

 

Powered by Internet Office, Inc.
Copyright © 2008 consult-rwa.com
Civil Engineering | Land Planning | Surveying and Mapping | Landscape Architecture
Land Development | Permitting | Infrastructure Design | Master Planned Communities
Water Resources | Transportation | Commercial | Industrial
Facilities | Utilities | Construction | Public Works | 3D Laser Scanner
Southwest Florida | Central Florida